Solar Installation Process Step by Step: What Happens From Quote to Switch-On

By Ultrateq Systems · Updated

Short answer

A solar installation starts with an energy audit and site visit, then design and a written quotation. After you approve, the team mounts panels, runs DC and AC cables, installs the inverter and batteries, earths and protects the system, tests it and shows you how to read the monitoring.

The steps

  1. Energy audit: review bills and list appliances.
  2. Site visit: check roof space, shade, orientation and equipment location.
  3. Design and quote: choose panels, inverter, batteries and protection.
  4. Approvals: arrange any permits and utility paperwork needed, for example for grid-tied systems.
  5. Mounting: fix rails and panels securely to the roof.
  6. Wiring: run DC cable to the inverter and AC to the distribution board with isolators and surge protection.
  7. Commissioning: test voltages, protections and battery settings.
  8. Handover: monitoring app, safety instructions and maintenance advice.

How long does it take?

A small home system may take one to two days on site. Larger commercial systems take longer. Delays often come from approvals or equipment delivery.

Plan ahead

Try the solar calculator, read how to choose an installer and see rooftop jobs in our work.

Common questions

Will installation damage my roof?

Done properly with the right mounts and sealing, it should not. Tell the installer the roof type.

Do I need to be home?

Be there at the start and at handover.

Is maintenance needed?

Periodic cleaning and an annual check are good practice. See our maintenance guide.